1. Location:
Locates next to National Highway 1. About 22km from Ha Noi Capital, about 33km
from Noi Bai International Airport, about 128km from Cai Lan Seaport (Quang
Ninh Province), about 122km from Hai Phong Seaport (Hai Phong City), about 136km
from Viet Trung Border Gate (Lang Son Province).
2. Planned area: 449ha
+
Phase 1: 1999 – 2049
+
Phase 2: 2006 – 2056
The Industrial Park was occupied 100%
3. Technical infrastructure:
+
Power supply station: Power is supplied from national grid through 110/22KV
(35KV) transformer station with capacity of 1x40MVA and 1 x 63 MVA.
+
Water supply station: Water treatment station with the first phase capacity of
7,000m3/day.
+
Telecommunication system: Telecommunication system reaches the international
standard
+
Wastewater treatment: Waste water treatment station with the capacity of 4,000
m3/day.
4. Services: Police station, worker house, polyclinic, banks, logistic center, post office... in industrial park
5. Social infrastructure: Tien Son Urban Area with scale of 24 ha located right
next to the Industrial Park to provide housing for experts and workers and
other utilities such as: restaurant, sport area,...
6. Total infrastructure investment capital: 837.5 billion VND
7. Investment owner:
Viglacera Corporation – JSC
Contact:
VIGLACERA REAL ESTATE COMPANY
-
Head Office: The Floor 2, Viglacera Building, No 1, Thang Long Boulevard, My Dinh Ward, Nam Tu Liem
District, Ha Noi Capital.
+ Phone number: (84) 24.3553.6688
+
Fax: (84) 24.3553.7666
+
E-mail: vir@viglaceraland.vn
-
Address in IP: Operation center of Tien Son Industrial Park, Tien Du District, Bac
Ninh Province.
+
Phone number: (84) 222.3838583
+
Fax: (84) 222.3838583
+
E-mail: vir@viglaceraland.vn
+ Website: viglaceraland.com.vn