1. Location:
Locates nearby the Highway 282 (ruite Ho street - Phu Thuy), to the south of Ho
Town. About 60km from Ha Noi Capital, about 65km from Noi Bai International
Airport, about 145km from Cai Lan Seaport (Quang Ninh Province), about 105km
from Hai Phong Seaport (Hai Phong City), about 140km from Viet Trung Border
Gate (Lang Son Province).
2. The total planned area: 504ha
3. Infrastructure:
+
Power supply station: Power provided by EVN. Power source is provided stability
and continuity, arranged along the axis of internal traffic..
+
Water supply station: Provides water to the fence of each enterprise.
+
Telecommunication system: Telecommunication systems to reach international
standards and are always ready to meet communication needs.
+
Wastewater treatment: Drainage and water treatment system are built into 2
separate systems, to ensure the best environment in industrial park
+
Finance: Vietinbank, Vietcombank, BIDV, DongA, Sacombank, Agribank…
+
Other gadgets: Fire protection systems: state-level standards.
4. Investment owner 1: Khai Son Company Limited
+ Head Office: Thuan Thanh 3 Industrial Park, Thanh Khuong Commune, Thuan Thanh District, Bac Ninh Province
+ Phone: (84)222.387.3062
+ Office Representative in Ha Noi: 7th Floor , North
Asia Bank Building , 9 Dao Duy Anh Street, Dong Da District, Ha Noi Capital.
+ Phone: (84) 24.3868 6154
+ Fax: (84) 24.2200494
+ Email: Khaisoncompany@gmail.com
+ Web: http://khaison.vn
4. Investment owner 2: Trung Quy Bac
Ninh Investment JSC
+ Address: Tam A village, Gia Dong commune, Thuan Thanh
district, Bac Ninh Provice.
+ Phone/Fax: (84)
+ Email: